JIANGLI FURNITURE

Home › Price Reference › 涿州 (Chinese original) Wardrobes

涿州 (Chinese original) WardrobesPrice Reference

This page shows the public reference prices currently approved and in effect for 涿州 (Chinese original) region: Wardrobes, for preliminary renovation or customization budgeting and for comparing configurations.

Important: The following are reference prices and do not constitute a formal quotation. The actual price must be calculated according to on-site dimensions, design drawings, material configuration, hardware, quantity, transportation and installation conditions and the on-site situation.

涿州 (Chinese original) WardrobesReference unit price

Configuration tier Material / configuration Pricing method Reference price
Basic E0颗粒板+PET门 (Chinese original) Projected area pricing 425–467.5 CNY/㎡
Mainstream ENF颗粒板+PET门 (Chinese original) Projected area pricing 595–680 CNY/㎡
Premium ENF生态板+PET门 (Chinese original) Projected area pricing 807.5–935 CNY/㎡

Current public price version:2026-Q4

How to choose a configuration

Basic

E0颗粒板+PET门 (Chinese original)

425–467.5 CNY/㎡

Mainstream

ENF颗粒板+PET门 (Chinese original)

595–680 CNY/㎡

Premium

ENF生态板+PET门 (Chinese original)

807.5–935 CNY/㎡

涿州 (Chinese original) WardrobesWhat to consider in a budget

The public reference unit price is mainly for preliminary budgeting. In an actual customization project you also need to confirm the specific dimensions, the carcass and door materials, the internal structure, the hardware configuration, special functional parts, the quantity and the transportation and installation conditions.

If drawers, glass doors, sensor lights, visible side panels, wall cladding or special hardware are added, they must be calculated separately according to the additional item parameters currently approved and in effect.

Pricing FAQ

涿州 Wardrobes — how much does it cost?

This page shows the public reference unit prices currently approved and in effect, listed by material and configuration tier. Reference prices suit preliminary budgeting; an actual project must be calculated together with dimensions, design, materials, hardware, quantity and site conditions.

Are the website prices the final transaction price?

No. The website prices are public reference prices and do not constitute a formal quotation. A formal quotation must be calculated from actual measurement, the design drawings and the finally confirmed configuration.

Why can reference prices differ between regions?

Different service regions may differ in market, transportation and project implementation conditions. The website generates regional reference prices from the commercial parameters currently approved and in effect.