Can tatami be made in Baoding High-tech Zone?
Tatami can be made on-site in Baoding High-tech Zone: the structure is basically the same as a wardrobe, the main difference is that top-opening doors are commonly used, and drawers can also be added separately. The distance is about 61–75 km, and logistics take 1–3 days.