A Guide to Avoiding Pitfalls in Whole-House Customization in Beijing
When doing whole-house customization in Beijing, these four things must be locked down before placing an order. First, re-measure after the water and electrical positioning is complete; the sink water supply and drainage, gas socket, and range hood exhaust path must all be confirmed in advance, otherwise the cabinets will have to be redone after installation. Second, wall closing: when measuring, confirm the flatness, kickboard, and internal and external corner conditions clearly, and write the closing method into the plan. Third, removal of existing cabinets cost: the quote does not include removal of existing cabinet bodies; if removal is needed, state it in advance and confirm it separately on site. Fourth, materials and schedule must be written into the order: choose the board from particle board, plywood, eco board, and OSB, and put the environmental grade, hardware brand, and processing cycle of 15–45 days all on paper.