How long does whole-house customization installation take on the day of installation?
How long installation takes on the day depends on the number of cabinets and the site conditions. Generally, a single-space wardrobe or shoe cabinet can be finished in half a day to one day; a kitchen cabinet with worktop, sideboard, and TV cabinet installed together often takes a full day or even two days. Uneven walls and complex edge finishing will add time. One reminder: the quote does not include removal of existing cabinets. If existing cabinets need to be removed, this must be stated in advance and confirmed separately based on the site, otherwise the day of installation can easily be held up. After installation, remember to inspect door gaps, hardware, and edge banding.